Quote:
Originally Posted by boilersuit View Post
What, no end doors? Doesn't look like a very flexible solution. And what about the regulation that trains have to end access if they run through single-bore tunnels?
There is a precedent for running trains with no end doors through single bore tunnels - 395s through Shakespeare Tunnel near Dover (although minor mods to the tunnel and numerous risk assessments were required!)