13:38

Welcome to Railway Forum!
Welcome!

Thank you for finding your way to Railway Forum, a dedicated community for railway and train enthusiasts. There's a variety of forums, a wonderful gallery, and what's more, we are absolutely FREE. You are very welcome to join, take part in the discussion, and post your pictures!

Click here to go to the forums home page and find out more.
Click here to join.


Go Back   Railway Forum > News and General Discussion > Railway News from around the World

Bombardier TWINDEXX Trains

Reply
 
Thread Tools
  #11  
Old 19th January 2014, 15:35
John H-T's Avatar
John H-T John H-T is offline
Station Manager
 
Join Date: Nov 2005
Location: Derbyshire
Posts: 6,351
Images: 528
The basis problem is that it would cost a ridiculous amount of money to raise the loading gauge for the existing railway. This is why the loading gauge was reduced during electrification of the West Coast mainline during the 1960's. The new Patriot "The Unknown Warrior" will have to be a maximum of 13' above rail level to fit under the wires.

The track bed through Belper on the Midland Main Line will have to be lowered by at least 4" to pass under the bridges over the line when the line is electrified soon.

There is still some scope to develop the existing rail network and this is in hand, but there is a limit. The existing network is now nearly at capacity and any development will only delay the inevitable. This why HS2 is vital as it can be built to an enhanced loading gauge, increase capacity and divert high speed traffic from the existing network to allow more capacity for freight and slower services.

The problem is that the case has not been explained carefully enough!

Best wishes,

John H-T.


__________________
Ecclesbourne Valley Railway.
LMS Patriot Group.
LMS Carriage Association.
Belper Model Railway Group.
Reply With Quote
  #12  
Old 19th January 2014, 16:57
Beeyar Wunby's Avatar
Beeyar Wunby Beeyar Wunby is online now  
Senior Member
 
Join Date: Dec 2012
Location: NW Norfolk
Posts: 831
Images: 4
Quote:
Originally Posted by John H-T View Post
The basis problem is that it would cost a ridiculous amount of money to raise the loading gauge for the existing railway.
Of course it would impossible to alter what is already there. But we should specify a new gauge NOW, so that all new infrastructure that is installed is future compliant. There's alot of renewals and P-Way investment taking place currently.

It's insane to be still building structures to an outdated spec.
Reply With Quote
  #13  
Old 20th January 2014, 17:57
wyvern's Avatar
wyvern wyvern is offline  
Senior Member
 
Join Date: Jan 2010
Location: Next to Owd George's last railway
Posts: 605
Quote:
The track bed through Belper on the Midland Main Line will have to be lowered by at least 4" to pass under the bridges over the line when the line is electrified soon.
It will be interesting to see what they do with Toadmoor Tunnel.
Reply With Quote
  #14  
Old 20th January 2014, 19:03
John H-T's Avatar
John H-T John H-T is offline
Station Manager
 
Join Date: Nov 2005
Location: Derbyshire
Posts: 6,351
Images: 528
Quote:
Originally Posted by wyvern View Post
It will be interesting to see what they do with Toadmoor Tunnel.
I'll try and find out.
__________________
Ecclesbourne Valley Railway.
LMS Patriot Group.
LMS Carriage Association.
Belper Model Railway Group.
Reply With Quote
  #15  
Old 20th January 2014, 19:35
wyvern's Avatar
wyvern wyvern is offline  
Senior Member
 
Join Date: Jan 2010
Location: Next to Owd George's last railway
Posts: 605
They are about to do a lot of work to speed up Ambergate Junction I understand. That will be interesting as well.
Reply With Quote
Reply

Tags
bombardie


Currently Active Users Viewing This Thread: 1 (0 members and 1 guests)
 

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is Off
HTML code is Off

Forum Jump


All times are GMT +1. The time now is 13:38.


Powered by vBulletin® Version 3.8.4
Copyright ©2000 - 2024, Jelsoft Enterprises Ltd.