Welcome to Railway Forum! | |
![]() | Thank you for finding your way to Railway Forum, a dedicated community for railway and train enthusiasts. There's a variety of forums, a wonderful gallery, and what's more, we are absolutely FREE. You are very welcome to join, take part in the discussion, and post your pictures!
|
|
![]() |
|
Thread Tools |
#41
|
||||
|
||||
The problem is the difference in altitude.
The original idea was to go down the west of the Matlock gorge. Now its all built up |
#42
|
||||
|
||||
A rack line from Cromford to Wirksworth !!
__________________
"If God had meant us to fly, he would never have given us the railways" Micheal Flanders |
#44
|
||||
|
||||
Quote:
And old diesels are not noisy ? ![]() Surely the noise is part of the attraction, unless one is an electric fan. ![]()
__________________
Philip. Last edited by pre65; 29th January 2011 at 14:08. |
#45
|
|||
|
|||
Personally, if it ain't steam, I don't want to know. I won't even leave the house to see a diesel - let alone pay good money to travel behind one.
Regards, 62440. Last edited by 62440; 29th January 2011 at 21:59. Reason: inserting two . |
#46
|
|||
|
|||
Alas, physical and cultural differences would prevent a physical link-up but I do have an alternative.
Both Wirksworth and Idridgehay are now destinations in the national ticketing database. If Peak Rail added Darley Dale and Rowsley South too, then perhaps a hypothetical 'Derbyshire Dales Ranger' ticket could allow travel between the two railways via the EMT service between Duffield and Matlock? Just a thought. Neil |
#47
|
||||
|
||||
Quote:
departs Kings Cross (not St Pancras) at 0900 and travel along the East Coast main line to Grantham, then Nottingham and Derby to Matlock and Rowsley hauled by 70000 Britannia (not 70013 Oliver Cromwell) the train will stop at Holme Junction to take on water apparently Published timings are London King's Cross dep09:00 arr21:30 Stevenage dep09:50 dep20:30 Peterborough dep11:20 dep19:50 Matlock dep13:00 dep17:20 Rowsley arr13:30 dep16:40 Prices Premier £199 gives Full English Light Lunch and 4 course dinner First £129 gives morning coffee and Danish pastries and afternoon tea and biscuits Standard £84 gives a reserved seat at a table for four. Anyone got enough money for two tickets TO London then a decent two on this train I haven't not sure how they will accommodate Wheelchairs anyway
__________________
Regards Gray The wheelchair Paparazzi https://www.flickr.com/gp/grays_photos/6P1643 Last edited by Madcaravanner; 7th February 2011 at 20:45. |
#48
|
||||
|
||||
Quote:
|
#49
|
||||
|
||||
Quote:
unfortunately couldn't afford the two tickets got to get from Chesterfield first then back after but thanks for info about MK1's I know MK3's have space do MK2 open stock have them too
__________________
Regards Gray The wheelchair Paparazzi https://www.flickr.com/gp/grays_photos/6P1643 |
#50
|
|||
|
|||
Hi gents,im new to this particular forum but was pointed this way by colleagues as some technical aspects of the Matlock connection were asked ,if i get a chance later on il update the posting with some better information though if youre after the details of how Matlock will work then theres already some long write ups on the NAT PRES forum regarding working into Matlock.
the key items though i think youre after answering are; 1.we will work into the disused platform. 2.as you rightly say NR arent keen on propelling anymore so top n tail is most suited. 3,we will use our own riverside as the siding for this loco ,why pay for all the works associated with altering matlock at great expense when you have it already. 4. you can either run in and out top and tail on santas with no uncoupling,top n tail with normal services or if you add five more minutes to the service,drop the original loco back onto the front of the train and leave the shunter there at riverside,through some permissive shunting operations on our side. hope that suffices a breif explanation, most of the signalling is now in on our side,just the box to errect and the rodding run to drop in place,around 27 jobs to complete before the box can be brought into useage. there is a fotopic site set up by my colleague on the works,search fotopic and type in peak rail you will find it. many thanks dom s&t |
![]() |
Currently Active Users Viewing This Thread: 2 (0 members and 2 guests) | |
|
|