Welcome to Railway Forum! | |
![]() | Thank you for finding your way to Railway Forum, a dedicated community for railway and train enthusiasts. There's a variety of forums, a wonderful gallery, and what's more, we are absolutely FREE. You are very welcome to join, take part in the discussion, and post your pictures!
|
|
![]() |
|
Thread Tools |
#71
|
|||
|
|||
Quote:
The best way for reaching full potential would be to use a mix of tram, trains and tram-trains. This would allow services between Stockport and Chester to continue at the same rate via normal train. A 12 minute frequency could operate between Altrincham platform1/2 and Bury by tram and a 12 minute frequency by tram-train between Altrincham platforms 3/4 and Central Manchester with alternate tram-trains continuing to Northwich. However, for that to be successful both train tickets and tram tickets would need to be accepted on tram-trains. |
#72
|
||||
|
||||
I think there was a seminar recently on bringing tram-trains to Britain.
I take a guess that if tram trains were used in this circumstance, they would have both a dieslel engine and a 750 V pantograph. I would quite like to see this, but I only hope they use decent liveries.
__________________
"We can pay our debt to the past by putting the future in debt to us..." |
#73
|
||||
|
||||
Quote:
![]()
__________________
"If God had meant us to fly, he would never have given us the railways" Micheal Flanders |
#74
|
||||
|
||||
I believe there is a six-tracker at Exeter St. Davids.
__________________
|
#75
|
|||
|
|||
Quote:
The trams and tram-trains would also need to run to a stricter schedule so that at stops like Altrincham you can say: xx:00, xx:10, xx:20, xx:30, xx:40, xx:50 to Central Manchester platform 3 xx:05, xx:15, xx:25, xx:35, xx:45, xx:55 to Bury platform 1 |
#76
|
||||
|
||||
Quote:
Also can you see Network Rail allowing Tram-Trains to run on the same lines as heavy freight trains? Cheers John. |
#77
|
|||
|
|||
Quote:
The strict schedule would need to apply between Timperley and Northwich. Currently part of the reason for a flexible schedule departing from Altrincham at present is if the next tram arrives early it is ready to take over at platform 1 so the previous tram needs to leave. Using different platforms at Altrincham and both lines through Navigation Road would allow a stricter schedule. Southbound tram-trains arriving early can be held at Altrincham or earlier. Trams-trains departing Northwich can be made to wait until it's time for their departure. Network Rail do operate signalling for both trams and trains from Deansgate Junction. A signallers strike would have seen a replacement bus service running between Timperley and Altrincham for this reason. |
#78
|
|||
|
|||
Replace the level crossing with an underpass.
Speeds up Rail, Tram, Pedestrians and Cars at the same time! |
#79
|
||||
|
||||
For tram trains to work in this case, there would have to be point rearrangements at Altrincham and at Skelton junction. Anyone know where we could see an artists impression of a british tram-train?
__________________
"We can pay our debt to the past by putting the future in debt to us..." |
#80
|
|||
|
|||
Apart from the PPM60 which is already running I dont think any images of british tram-trains have been produced.
|
![]() |
Currently Active Users Viewing This Thread: 1 (0 members and 1 guests) | |
Thread Tools | |
|
|