Welcome to Railway Forum! | |
![]() | Thank you for finding your way to Railway Forum, a dedicated community for railway and train enthusiasts. There's a variety of forums, a wonderful gallery, and what's more, we are absolutely FREE. You are very welcome to join, take part in the discussion, and post your pictures!
|
|
![]() |
|
Thread Tools |
#1
|
|||
|
|||
Most unusual combination of trains running a service.
While waiting for a train a couple of weeks ago a train arriving in the other direction (more than 20 minutes late) was a 150 in North Western livery, followed by a 156 in Arriva Trains Northern livery, then a 142 in Mersey Travel livery.
This was on the 9:30 from Northwich (Cheshire) to Blackpool, having gone from St-Annes-on-Sea (Lancashire) to Greenbank (Cheshire) in the other direction. I only found out this morning why this combination of trains was used. Apparently the horn was out of order on the 156 and couldn't easily be fixed. The only spare unit available was a 142. Northern decided that it would take too long to detach the 156, and that replacing it with a 142 would likely lead to more overcrowding than usual. So they attached the 142 to the front. Apparently what they forgot is that 142s shouldn't be hauling two sprinter trains full of passengers and caused the service to run slower than normal. Why is it that most TOCs can't have a few locomotive engines to use in this sort of situation. If they did it would probably reduce the number of cancellations due to faults with trains as well? |
#2
|
||||
|
||||
Quote:
Thus it figures that it costs a TOC far less to cancel the odd service rather than permanently hire a 'Thunderbird' which is not often used (plus the incurred costs of driver training/traction refreshing). There are exceptions to this but they tend to be the prestigiuos TOCs rather than the everyday ones; eg GNER keeps a 67 in readiness at KX. |
#3
|
||||
|
||||
I'm not sure why the 142 was "hauling" the 150/156 as they all have the same type of "multiple working" system. If it was only the horn that was faulty on the 156 it should still have been able to provide power for the combined train along with the 150.
__________________
John …….My Railwayforum Gallery |
#4
|
||||
|
||||
Yea, if neither the high or low tone of the horn was working it's usual practice to remarshall the train to 'box in' the faulty unit with a good one in front of it. I don't know these particular traction types, but I would have thought that they could work in multiple.
|
#5
|
|||
|
|||
I'm not sure if 'hauling' is the right word but I know someone who was travelling on the train when the 142 was at the front and he said the front train was accelerating and braking very slowly.
|
#6
|
||||
|
||||
![]() Quote:
The expression 'drag' is slang and tends to grate on some railwaymen's nerves, myself included. Maybe I'm a bit oversensitive though because when I was a trainee we were made to stand in the corner if we used slang. (No doubt there'll be a cacophony of grizzled drivers along soon who have driven every traction known to man and have always said drag. ![]() |
#7
|
||||
|
||||
I think we're getting side-tracked by trying to define the word "hauling".
It doesn't really matter if the correct term is hauled, pulled, towed, dragged or something else. What I can't understand, if the only problem was a faulty horn, why the engines of the 150 and 156 were not being used in multiple with the 142 in order to provide power for the whole train . ![]() No wonder it was running late if the 142 was being asked to tow, sorry haul ![]()
__________________
John …….My Railwayforum Gallery |
#8
|
|||
|
|||
Quote:
It's annoying that companies like Virgin and GNER aren't allowed to timetable their trains to take longer to meet puncunality targets, yet other companies such as Northern Rail and Arriva Trains Wales are. Arriva Trains Wales provide the most obvious example of it in the Manchester to North Wales route, whereby trains are timetabled to take 3 minutes to get from Manchester Piccadilly to Manchester Oxford Road, but 9 minutes to get from Oxford Rd to Piccadilly. |
#9
|
||||
|
||||
Quote:
Because the section of track between Castlefields Junction and Manchester Piccadilly East Junction is so heavily used some degree of flexibilty needs to be built into the timetable to allow for trains running out of sequence and this is probably an example of it. Surely Network Rail wouldn't allow Arriva Trains Wales the luxury of such timings on this busy section of railway without good reason...........or would they? ![]()
__________________
John …….My Railwayforum Gallery |
#10
|
|||
|
|||
It was Northern's Customer Relations team who said the problem was a faulty horn, so it's possible that they got it mixed up with a delayed service elsewhere.
|
![]() |
Currently Active Users Viewing This Thread: 1 (0 members and 1 guests) | |
|
|