View Single Post
  #1  
Old 29th December 2012, 13:53
Madcaravanner's Avatar
Madcaravanner Madcaravanner is offline  
Senior Member
 
Join Date: Nov 2010
Location: Chesterfield, Derbyshire
Posts: 977
Smile On the workbench

Grassmoor (my loft layout in OO gauge) will soon have a wagon works on the layouts industrial area
the main building is 85% done and the overhead crane is 90% done

Just got to work out the entry of wagons to the building whether to use a cascade of points or to use a traverser

Already got a 0-4-0 T for motive power so which to use ................
Attached Images
File Type: jpg 20121228_200026.jpg (104.2 KB, 34 views)
File Type: jpg 20121228_200038.jpg (103.4 KB, 31 views)
File Type: jpg 20121229_125155.jpg (158.8 KB, 32 views)
File Type: jpg 20121229_125428.jpg (148.0 KB, 32 views)
File Type: jpg 20121229_125312.jpg (134.3 KB, 27 views)
__________________
Regards
Gray
The wheelchair Paparazzi

https://www.flickr.com/gp/grays_photos/6P1643
Reply With Quote