View Single Post
  #11  
Old 30th November 2008, 22:21
John H-T's Avatar
John H-T John H-T is offline
Station Manager
 
Join Date: Nov 2005
Location: Derbyshire
Posts: 6,351
Point Installation, Duffield pt 1.

This week, over a period of four days, the point at the northern end of run round at Duffield has been installed with the help of a small detachment from the Army.

The first set of photos show: 1, Site briefing with most of the parts including the switch blades laid out. 2. Unloading one of the check rail sections. 3. Plain track lifted, switch rail section in place. 4. Kit of parts for 2nd section laid out. 5. Rail cutting.
Attached Images
File Type: jpg PB240294f.jpg (125.7 KB, 7 views)
File Type: jpg PB240296f.jpg (109.9 KB, 8 views)
File Type: jpg PB250310f.jpg (117.6 KB, 7 views)
File Type: jpg PB250315f.jpg (129.6 KB, 6 views)
File Type: jpg PB260337f.jpg (94.1 KB, 6 views)
Reply With Quote