Smile Point Installation, Duffield pt 2.

Part 2 shows the work done on days 3 & 4:

1. 2nd section of the point in place.
2. Timbers laid out for 3rd section.
3. All three sections in place.
4. The last joint was a bit wide so we had to use the hydraulic puller.
5. Mainline complete.