After the huge hole that has been ripped out of the sea wall, it will probably take at least six weeks to design an new wall and to source the stone to rebuild it. That has to be done before the track bed can be rebuilt and all the services re-installed. All this will take time. With luck and a following wind, the line might be open by the end of May.
|