View Single Post
  #7  
Old 3rd April 2013, 23:01
Bubblewrap's Avatar
Bubblewrap Bubblewrap is offline  
Senior Member
 
Join Date: Dec 2007
Location: Loughborough(Twinned with Legoland)
Posts: 1,103
Point two the cutting between the the Mansfield Road Tunnel & the Sherwood Rise Tunnel has been filled in. (Site of Carrington Station)
Point three the cutting at the North end of the Sherwood Rise Tunnel(near Perry Road) has been back filled.
And the site of Bulwell Common Station Has been built on.
__________________
Either he's dead or my watch has stopped.
Groucho Marx

Last edited by Bubblewrap; 4th April 2013 at 07:30.
Reply With Quote