Fthr update - the LEVEL CROSSING is back!!

Meanwhile as part of the restoration, North Weald’s Up platform has recently been completed! This structure encompasses the original 4 coach platform, as well as extensions to the east and west, to enable us to run longer trains. All the extension pieces have been carefully moulded to match the original, and finished off with period lamp posts in LNER green. This week the final surface has been laid, topping off this project. In addition at the east end, the level crossing gates from Chitt’s Hill (the last manual operated gates on the Norwich line) have been installed. These are placed on the site of North Weald’s original level crossing which was closed in 1968, and are part of the works to improve footpath user safety and comfort and enable disabled access to the Up platform.

Up Platform and Level Crossing nearing completion at North Weald

See website for latest pix http://eorailway.co.uk/news/
Reply With Quote