2nd February 2010, 17:38
|
Senior Member
|
|
Join Date: Jun 2009
Location: Fife, Scotland
Posts: 141
|
|
Hi guys,
Finally did some more work on the layout during the weekend. The rocky cutting is now finished and look not too bad. A couple of photos show the pasenger train overtaking the slow goods and a close up of my LNER engine.
I am now planning out the lower level track. One of the main features will be an engineering works. It still has a bit of work to done. The buildings are from Kestrel and the rest has been scratchbuilt using balsa and various pieces of plastic strip/rod. The gantry crane was built out of Evergreen H beam. I still have to work out the winch system yet. As you can see one loading bay is for the wagons and the other for the flatbed/container trucks. There is another siding which goes to the rear of the building so smaller items can be offloaded straight into stores.
One final extra detail is a parcel wagon that has had it's door cut open and an internal load of parcels installed. You can see they are about to be unloaded at the main goods depot.
Alex
|