Well I do admit sometimes I sleep type, but it is not going that badly locojoe.
That is apart from the track crisis that occured yesterday.
If you remember it was in derailed, but it has slowly materialised into something that is becoming a reality and was quite rightly moved into narrow gauge.
Again I will simplify.
We decided on a railway a while back whilst walking the route.
Then we contacted the council about a possible project.
We have heard that a decision is still being worked out.
We have planned 4 stages.
I have started to collect track.
Now we have a problem: the track could be ripped up from the peat site and totally obliterated, setting back the project if not destroying it if I cannot get enough track.
At present there is enough for about phase 1.
I am doing my very best.