View Single Post
  #110  
Old 25th September 2009, 18:03
steam for ever's Avatar
steam for ever steam for ever is offline  
Senior Member
 
Join Date: Jul 2009
Location: Cheshire
Posts: 2,238
I am soon going to get in touch with the mational trust.
This is for the lyme park trips.
I have pretty much narrowed down the Higher Poynton station problem.
There are two options.
1. is to raise the trackbed with the method I have described.
2. is to use the old servicing steps part way down each platform and have a lower down set of platfroms inbetween the originals.
I realise that narrow gauge trains are narrower than standard gauge ones, so hopefull there will be enough room for this.
The proposed buildings here are going to be pretty much replicas of the originals as well as new canopies.
__________________
"We can pay our debt to the past by putting the future in debt to us..."