Quote:
Originally Posted by mjobling
Is there something planned besides eventual track-lifting? I thought they are very soon going to extend the southbound platform at Farringdon, cutting off the branch.
|
The southwards extension of Pl 3 at Farringdon is certainly the reason for this, but it won't be happenening immediately.
Quote:
Will the branch still be used as a stabling point for a while?
|
Yes, and also a bolthole for 319 and 377s which fail in the KX corridor or won't switch from AC to DC at Farringdon.
Best wishes,
FP