Railway Forum

Railway Forum (https://www.railwayforum.net/index.php)
-   Railway News from around the World (https://www.railwayforum.net/forumdisplay.php?f=29)
-   -   Peak Rails Link to Network Rail at Matlock (https://www.railwayforum.net/showthread.php?t=9090)

John H-T 16th January 2011 21:26

Peak Rails Link to Network Rail at Matlock
 
3 Attachment(s)
Work is now progressing well at Matlock to link Peak Rail to the National Network ready to receive the proposed mainline charter on March 5th.

Some photos taken today.

Best wishes,

John H-T.

whitemoor66 17th January 2011 22:27

I hope the project is a success. I hope to visit April/May time.

Madcaravanner 18th January 2011 11:28

Wish I had taken some pics now pulled into the Station at Matlock nice new double track all ready and waiting

saxokid 20th January 2011 03:07

Quote:

Originally Posted by John H-T (Post 57731)
Work is now progressing well at Matlock to link Peak Rail to the National Network ready to receive the proposed mainline charter on March 5th.

Some photos taken today.

Best wishes,

John H-T.

Looks good!! :)

John H-T 20th January 2011 12:40

Sadly I have to report, according to local sources, that the proposed charter on March 5th has been put off until the summer.

best wishes,

John H-T.

whitemoor66 20th January 2011 23:49

Why John H-T?

62440 21st January 2011 00:16

Seems that someone forgot that there's a service running on that line on Saturdays, and there are no spare paths!

John H-T 21st January 2011 08:16

Quote:

Originally Posted by whitemoor66 (Post 57880)
Why John H-T?

Difficult to say as much is based on rumour. However it does seem fairly certain that the charter has been postponed.

Best wishes,

John H-T.

wyvern 21st January 2011 11:28

It seems likely as on weekdays and Saturdays, on the single line from Ambergate to Matlock as soon as the up train leaves the branch the down enters.

The only solution I imagine is for the (replaced) extra track at Matlock Platform 1 (as was) to be made a passing loop. Another train might sneak though in the quarter hour the train stands at Matlock, but it would be tight and complicated.

There isnt time for EMT to run on to Rowsley and back even if EMT were agreeable.

62440 21st January 2011 14:04

http://www.uksteam.info has this re-scheduled for 22nd May (A SUNDAY!). Loco is now 70013.

Regards, 62440.


All times are GMT +1. The time now is 07:45.

Powered by vBulletin® Version 3.8.4
Copyright ©2000 - 2024, Jelsoft Enterprises Ltd.