Railway Forum

Railway Forum (https://www.railwayforum.net/index.php)
-   On-track Machinery (https://www.railwayforum.net/forumdisplay.php?f=34)
-   -   "The Dash to Duffield" - Ecclesbourne Valley Railway (https://www.railwayforum.net/showthread.php?t=3168)

John H-T 23rd September 2010 08:30

Quote:

Originally Posted by DSY011 (Post 54027)
That takes care of September, so what will you be doing next month? (LOL)

Watch this space!!

Best wishes,

John H-T.

wyvern 24th September 2010 09:38

Quote:

Originally Posted by John H-T (Post 53993)
Today the official golden sleeper and spike were placed just south of Hazelwood in front of the TV cameras. Great feeling to know that we have got the job done within the time scale set.Best wishes,John H-T.

Looks as though you just got done in time before the weather broke!

Congratulations

John H-T 24th September 2010 11:14

Quote:

Originally Posted by wyvern (Post 54073)
Looks as though you just got done in time before the weather broke!

Congratulations

Thanks. At least the pressure is off. We can now get on with the remaining jobs without feeling guilty when we shelter from the odd rain shower!

Best wishes,

John H-T.

John_142 29th September 2010 15:38

Congratulations.. When does the Work Start on the Extention to Rowsley Village..?

5701 29th September 2010 16:43

Congrats on what you have all acheived so far the trackwork looks first class hope the jumbo train goes well.Will definitely visit next year .

wyvern 29th September 2010 17:58

Quote:

Originally Posted by John_142 (Post 54231)
Congratulations.. When does the Work Start on the Extention to Rowsley Village..?

I think that idea fell by the wayside in the nineteenth century when the line was built. :):)

John H-T 29th September 2010 19:41

Quote:

Originally Posted by John_142 (Post 54231)
Congratulations.. When does the Work Start on the Extention to Rowsley Village..?

When we have good quality Station Buildings at Wirksworth and Duffield, two train running, decent workshop and maintenance facilities for Locos and Carriage and Wagon and the Railway is on a sound financial footing. In short when we have developed our current Railway to it's full potential!

It has often been said that eight and a half miles is about ideal for an Heritage Railway. That is what we have got. There is about 20 years work to develop what we have got and lift us into the Premier League. After all we will be one of the top 20 longest Heritage Railways in the UK!

Money connecting us to Peak Rail would be better spent getting them to Bakewell, which would be a real service for the National Park and the enviroment. Anyway we are linked by the Matlock Branch, why duplicate the route?

On a more immeadiate level we manage to change 20 more sleepers today in spite of the weather. These are the sleepers it is desirable to change before tamping the whole line.

Best wishes,

John H-T.

62440 5th November 2010 23:46

I've been watching this space carefully since post 71 John, but you seem to have been keeping this http://rail-news.com/2010/10/27/stea...me-since-1965/ under your hat. Congratulations to all involved!:D

Regards, 62440.

5701 6th November 2010 12:50

Grey power triumphs you could offer your services for HS2 might be built quicker.Well done and keep up the good work.

John H-T 7th November 2010 21:09

Sorry Folks not to have kept you up to date. A lot more news and some photos. Will make a more detailed post tomorrow.

Best wishes,

John H-T.


All times are GMT +1. The time now is 17:06.

Powered by vBulletin® Version 3.8.4
Copyright ©2000 - 2025, Jelsoft Enterprises Ltd.