![]() |
Quote:
I think they have been done professionally. I am not sure who paid, possibly the owners. As far as I know the pattern is the one originally used in the mid 50's when the Derby Lightwieghts were introduced. Best wishes, John H-T. |
The Green Park Royal Unit at Lloangollen has the same or very simmilar seatingbut I do think Llnagollen has the Best Selction of Heritag4e DMUs not so MUch the EVR buut the EVR does have a Good Selction of DMUs Just eager to have a ride behind the cls 31..
|
Quote:
|
Two Weeks to go!
3 Attachment(s)
First Public Trains to Duffield are due to run two weeks today see:
There is a flurry of last minute activity: Duffield Platform is now more or less complete. Standard 2 78019 has arrived and successfully completed gauging trials yesterday. The LMS Open Third Coach is nearly complete. Inspection Saloon has had a complete repaint. Centre Car for the Class 101 is complete. Plus many other jobs, these are just the headlines! Photos of 78019 and Duffield Platform attached. Best wishes, John H-T. |
Is the centre coach for the 101 an actuall 101 cwntre coach as I don't rember 101s having centre coaches ?
|
Yes it is a Class 101 Centre Car see page 20 of the EVR Stock List for info:
http://www.e-v-r.com/documents/stocklist.pdf Best wishes, John H-T. |
Quote:
Prehaps the EVR would be Interested in this class 115 3 car for sale The three vehicles are believed to be 51655 http://www.cs.vintagecarriagestrust....o.asp?Ref=3010 59664 http://www.cs.vintagecarriagestrust....o.asp?Ref=3099 51677 http://www.cs.vintagecarriagestrust....o.asp?Ref=3013 and were in reasonable condition when last seen. Information form another forum that Im on. Atleast if they bought it then the Centre car could be loaned to the ELR or SVR as I belive they need one. |
!2 days to go!
2 Attachment(s)
Test train to Duffield today including newly restored LMS Stanier Open Third Coach. Public Opening now only 12 days away.
Best wishes, John H-T. |
Good couple of photo's John, all the best for the reopening
|
Things are looking good from your photos John and the platform and all the hard work that has gone into building the infrastructure is a credit to all. Cant wait to visit.
|
All times are GMT +1. The time now is 12:19. |
Powered by vBulletin® Version 3.8.4
Copyright ©2000 - 2025, Jelsoft Enterprises Ltd.