View Single Post
  #14  
Old 27th December 2014, 16:01
HM181's Avatar
HM181 HM181 is offline
Senior Member
 
Join Date: Apr 2010
Location: The Mill
Posts: 329
Just after the miners strike in1985, we had class 56 locos to go from Mills to Fiddellers Ferry Power Station with 36 HAA in tow.
On arrival at Warrington, we had to run round the HAAs at the Canal sidings, the drop down to the football sidings and then RR the train again. Each RR could take hours before we could get into the Power Station.
Whilst waiting to go to FF, streams of MGR's from up north came into Warrington powered with nose to nose Class 1 Bo-Bo's complete with a fitted Brake Van with a guard riding on the brake. This means that the trains would just propel into the football sidings , having only run round the one time, whilst we had to RRx2.
This made the job back to the mill over 16 hours.
Some folk loved that but not for me.
Reply With Quote