View Single Post
  #7  
Old 27th December 2009, 16:29
Alex Crawford Alex Crawford is offline  
Senior Member
 
Join Date: Jun 2009
Location: Fife, Scotland
Posts: 141
Hi,

Another short update. The upper twin track is now down and pinned. It is till powered by the one controller but I hope to get another controller soon. The village street is almost complete. Just some minor details, which can get added at a later date. The paving slabs have all been cut out and stuck down individually. It's an improvement on my previous attempt at pavements by using strips of balsa wood painted grey. They were painted light grey and a wash of black fills in the joins so they stand out. The same method was used in some of the driveways for the houses.

My next task is to wire up the 7 points in the station/yard area and do the lights for the station platform.

Alex
Attached Images
File Type: jpg post office.jpg (59.9 KB, 24 views)
File Type: jpg kenmore st.jpg (52.5 KB, 25 views)
Reply With Quote