View Single Post
  #3  
Old 14th January 2018, 07:20
aussiesteve's Avatar
aussiesteve aussiesteve is offline
Senior Member
 
Join Date: Dec 2017
Location: Bathurst
Posts: 578
G'day Master Cutler,
The rail gauge is the same, but the rollingstock loading gauge is different.
The tunnels being bored are not capable of double decker emu cars.
I would also presume that the overhead supply will be different, though don't know the details of the Metro.
Yes, privatization is all the go down-under.
Steve.
Reply With Quote