Nene Valley Railway
September 21 Dine with the Duke (check times etc with NVR)
September 22 and 23 Duke and Tornado plus according to NVR website all(?) steam locos in operation (believe that if I ever see it happen).
Duke and Tornado supposedly double heading last train (they will need to dig out some more stock to get them to puff a little).
Steam crane in operation as well.
John.
|