Quote:
Originally Posted by JEB-245584/2
Something simple, or it could be part demolished and refurbished, the half of the footbridge over the Met lines is surplus to requirements as there is a platform level crossing to the rear of the tram in your photograph
|
That inconveinces passengers going from the tram to the Chester bound platform and with the unpredictable tram timetable some people have to run between the tram platform (1) and platform 4 so an extra minutes walk would not be good.