This weekend in Twello a little town in the Netherlands a brand new railroad crossing was realized.

there is a little film on youtube in which you do see the what kind of work has to be done to realize a crossing, even for pedestrians, bikers and farmingvehicles.
there is some footage on termic welds,
and some stuff regarding minus component [ in the Netherlands traction is realized bij 1500V DC where the minus is the track]

search for hartelaar voorst AHOB
or follow the next link

http://www.youtube.com/watch?v=B47W1qvDpRY

ENJOY

John H-T 22nd February 2011 21:00

Welcome to the Forum telmachine and thank you for the link.

Best wishes,

John H-T.

DSY011 22nd February 2011 21:21

Hello telmachine and welcome to the Railway Forum. I found you film of termic welds very interesting. I have never seen it done as I left the railways back in 1969.

Ploughman 23rd February 2011 20:02

OK as far as it goes but an awful lot of the weld process left out.
Mind you the book time for a weld is about 1 1/4hrs so understandable that some has been cutout.
No setting up of the rails.
No feature on the stressing that has taken place. (The yellow clamps and bars around the welds.)
No setting up of the weld moulds.
Preheating only seen in the background.