Railway Forum

Railway Forum (https://www.railwayforum.net/index.php)
-   Railway Modelling (https://www.railwayforum.net/forumdisplay.php?f=26)
-   -   Hereford Railways in N Gauge (https://www.railwayforum.net/showthread.php?t=15949)

RogerFarnworth 7th March 2018 13:01

Hereford Station:



https://wordpress.com/post/rogerfarn...dpress.com/473

RogerFarnworth 7th March 2018 13:03

The 6th post in the series about Hereford Station building:



https://wordpress.com/post/rogerfarn...dpress.com/617

RogerFarnworth 7th March 2018 13:04

The 7th post in the series:



https://wordpress.com/post/rogerfarn...dpress.com/636

RogerFarnworth 7th April 2018 19:06

The card models on the layout were constructed from drawings made on 'Paint'. I have just loaded drawings of the Signal Box at the North of the Station and of the Station footbridge onto my blog. The relevant links are:

https://rogerfarnworth.wordpress.com...uge-card-model

and

https://rogerfarnworth.wordpress.com...del-in-n-gauge

RogerFarnworth 11th April 2018 17:51

A link to a wider range of photos of the Hereford layout:

https://rogerfarnworth.wordpress.com...ss-photographs

RogerFarnworth 16th November 2018 18:04

It has been quite a while since I posted on this thread, so I thought a few pictures might be a good idea after visit to my loft last week.

http://rogerfarnworth.com/2018/11/10...-november-2018

Sadly progress is very slow as other matters have demanded my time.

RogerFarnworth 11th June 2022 09:03

Some time back I was posting about modelling Hereford in N Gauge.

We were living in Ashton-under-Lyne and the modelling took place in the Vicarage loft. I am now retired with my wife still working.

We have now moved to Telford and the powers that be have generously allocated a relatively large bedroom for the layout. Some compromises are inevitable as the space is smaller than the loft in the Vicarage in Ashton-under-Lyne.

Staging has been built and my library is close to being sorted out. I will need one new fiddle yard, the electrics will need connecting board to board for the layout and some damage will need to be rectified.

Completing the staging is a good step forward!

I will post pictures over the next little while. ..

RogerFarnworth 11th June 2022 09:27

Pictures of the Layout room in Telford.

https://rogerfarnworth.com/2022/06/0...-hereford-2022

RogerFarnworth 13th June 2022 19:38

Hereford in N again, the Move. ...

Moving felt like a major exercise. I have a large amount of stock and initially could not imagine how I might be best getting it all from one home to another. ...

http://rogerfarnworth.com/2022/06/13...xes-for-moving

Beeyar Wunby 14th June 2022 15:24

Thanks for sharing your experiences with us Roger. I admire your meticulous approach.
Also your trackwork, it looks very realistic in the photos.

Keep it coming, best wishes John.


All times are GMT +1. The time now is 00:12.

Powered by vBulletin® Version 3.8.4
Copyright ©2000 - 2024, Jelsoft Enterprises Ltd.